Built in the western industrial zone, Beit Shemesh.
about the project
Engineering Expertise, Delivered on Site.
Built in the western industrial zone, Beit Shemesh. The area of the building is about 3,000 square meters. Inside it is a production hall with open areas for work departments and offices. The skeleton of the building is made of steel with prefab concrete galleries with prefab walls. The roof of the building is covered with insulated panels. The building was designed and executed within six months by Shay Gil Projects.
Demonstrated abilities: Planning · Steel construction · Prefab elements · Cladding and roofing
- domain
- Industry & Manufacturing
- role in the project
- Design & Build
- location
- Western Industrial Zone, Beit Shemesh
- Client
- Polisiv
- Status
- Completed
- area
- About 3,000 square meters
- Duration of execution
- within six months